The Office Move Checklist: 12 Systems That Have to Move With Your People
Space Management

The Office Move Checklist: 12 Systems That Have to Move With Your People

24 Nov, 20269 min read24 Nov, 2026

An office move checklist is a list of every system, asset and service that has to change when people change location. A complete one covers 12 systems: seating, move requests, service tickets, assets, access cards, parking, cab routes, visitor host details, meeting rooms, mail, IT changes and people data.

Most checklists cover boxes, movers, furniture and floor plans. Fewer cover how people actually get to and into the new office: their cab pickup, their parking slot, their access card and the visitors who come to see them. Those are the items employees notice first, so they are the focus of this checklist.

Why office moves feel finished but aren’t

Employee at a new office door with an access card that is not working, showing an office move that looks finished but isn't

Move day is the part everyone plans. Many of the problems people notice show up in the first weeks afterward, in systems nobody put on the plan.

An employee sits at the right desk, but their access card still opens the old floor. Their cab pickup is still routed to the old building. Their parking slot is held by someone who moved months ago. Reception sends a visitor to a host who no longer sits there. A monitor that was supposed to move with them is still tagged to the old location.

Each of these is small. Together they decide whether people trust the move. The common cause is that the move was planned as a seating change, while people depend on a dozen connected systems, each with its own owner and its own records.

The 12-system office move checklist

For each system, name one owner, set a start date and add a check for the first 30 days after the move. The start times below are suggested starting points for a full relocation. Scale them to the size of your move.

New office floor with blue connected points over the desk, door reader, meeting room and parking, showing the 12 systems in an office move

System

What breaks if you skip it

Usual owner

Start

1

Seating and floor plans

Wrong desk assignments, double allocation

Facilities, real estate

12+ weeks before

2

Move requests and approvals

Untracked moves, conflicting requests, no audit trail

Workplace or space manager

12+ weeks before

3

Service requests and tickets

Furniture, cabling, cleaning and setup tasks fall through

Facilities, IT

8 weeks before

4

Assets (laptops, monitors, furniture, lockers)

Items lost, left behind or tagged to the wrong owner

IT, admin

8 weeks before

5

IT installs, moves, adds, changes and disposal (IMACD)

Network ports, printers and phones not ready; old devices not retired

IT

8 weeks before

6

Parking assignments

Slots held by people who moved, new arrivals with none

Admin, facilities

8 weeks before

7

Cab routes and shuttle stops

Pickups and drops still point to the old site

Transport, admin

4 to 8 weeks before

8

Access cards and door permissions

People locked out of the new floor, or still able to enter the old one

Security

4 weeks before

9

Meeting rooms and managed rooms

Rooms unbookable, catering or AV not set up

Workplace team

4 weeks before

10

Mail and courier forwarding

Deliveries to the old address, lost documents

Admin

4 weeks before

11

Visitor host details

Guests sent to the wrong floor, hosts not notified

Reception, security

Move week

12

People data (HRMS, directory, emergency lists)

Wrong location on records, warden lists out of date

HR, facilities

Move week

What to check in each system

1. Seating and floor plans: Check assignments against headcount per floor, then publish the new plan. If you use neighborhoods or team zones, move the zone, not just the people.

2. Move requests and approvals: Log every move as a request with a source, a destination and an approver. Moves agreed in chat or email are the ones most likely to be missing from the plan.

3. Service requests and tickets: Turn each physical task into a ticket with an owner and a due date: furniture, power, cabling, signage and cleaning. A move is done when its tickets are closed, not when people sit down.

4. Assets: Record what moves with each person and what stays. Update the location and custodian on every item.

5. IT installs, moves, adds, changes and disposal (IMACD): IMACD is the IT term for the five types of request that cover a device from setup to retirement. Facilities teams often say MAC (moves, adds, changes) for the same idea (TechTarget). Confirm that ports, Wi-Fi, printers and phones are live before people arrive. Plan how old devices will be retired.

6. Parking assignments: Re-run allocation for the new site and release slots held by people who no longer use them. Parking is easy to leave off a move plan because it often sits with a different team. For allocation models, see our guide to parking lot management.

7. Cab routes and shuttle stops: If employees use company-arranged cabs or shuttles, their pickup points, route timings and eligibility all depend on the office address. Rebuild the routes before move day and tell employees which pickup applies from which date. Plan late-shift and night-shift travel separately.

8. Access cards and door permissions: Add permissions for the new floor before move day. Remove the old ones after a short overlap. Test with real cards, not just the admin console.

9. Meeting rooms and managed rooms: Rooms that need catering, AV or setup are different from open rooms. Decide which rooms will be managed at the new site and how people will request them.

10. Mail and courier forwarding: Set up redirection with your postal service and update vendor and courier address records. In India, India Post handles mail redirection through the post office serving the old address (Post Office Guide). In Australia, business mail can be redirected for 1, 3, 6 or 12 months (Service NSW). Assign one person to collect misdirected mail for the first month.

11. Visitor host details: Hosts need the right floor, desk or room on file, and reception needs the new floor plan. Check pre-registered guests for the first week by hand.

12. People data: Update the location field in your HRMS and directory. Refresh the fire warden and first aid lists for the new floor.

Commute and parking: the part most plans miss

Employees walking to a shuttle at a new office at dusk, showing the commute and parking changes to plan for in an office move

A new address changes how every person gets to work. Commutes can get longer or shorter, a shuttle stop can disappear and the car park can be oversubscribed on the first Monday.

Before you fix a move date, answer five questions:

  1. Which employees will see a materially different commute, and have they been told?

  2. Have cab routes and pickup times been rebuilt for the new site?

  3. Does the new car park have enough slots for the people who drive, and who gets them?

  4. How will late-shift and night-shift travel work from the new location?

  5. Who will handle commute complaints in the first two weeks?

What to include in an office relocation plan

An office relocation plan is the project version of this checklist. For a full relocation, JLL suggests starting preparation up to 24 weeks in advance (JLL). A practical plan includes:

  • Scope and date: which teams, floors and sites are moving, and when

  • Owners: one named owner for each of the 12 systems

  • Timeline: start dates working back from move day, as in the table above

  • Communication plan: what employees hear, when, and from whom, including commute changes

  • Cutover plan: what switches on move day, such as access, routes and the floor plan, and what to do if something fails

  • Post-move review: a 30-day check on every system, with open issues tracked as tickets

Internal churn vs. full relocation

The 12 systems apply to both, but the effort differs.

Internal churn 

(within a building or campus)

Full relocation 

(new address)

Frequency

Continuous, often weekly

One-off project

Biggest risks

Untracked small moves, stale floor plans, unreturned assets

Mail, commute, parking, access and vendor addresses all changing at once

Best approach

A standing request and approval process

A dated project plan with a cutover rehearsal

Systems most affected

1, 2, 3, 4, 8, 9

All 12

Teams with high churn benefit most from a move process that never closes. For them, the cost isn’t one big move. It’s hundreds of small moves, each of which can leave a record out of date.

Keeping the floor plan accurate after the move

A floor plan is accurate on the day you publish it and starts drifting soon after. Three habits keep it accurate:

  1. Treat every change as a move request, even a single desk swap.

  2. Reconcile monthly against badge data, bookings or a walk of the floor.

  3. Close the loop with tickets. A move is complete only when its tickets and asset transfers are closed.

For organizations with several sites, one shared source of truth matters even more. See our guide to a workplace management system for multi-location offices and our definitive guide to space planning.

What to look for in move management software

Move management software handles move requests, approvals, scheduling and tracking, and updates the floor plan when a move is complete. When you compare options, check whether it:

  • connects move requests to the live floor plan, so seating updates automatically

  • creates service tickets for the physical work behind each move

  • transfers assets to their new location and owner

  • updates parking, room and visitor records along with seating

  • connects to commute planning if you run employee transport

  • reports on churn and on moves still open

How WorkInSync covers the 12 systems

WorkInSync is the workplace management suite from MoveInSync, which also runs employee commute. That means seating, parking, rooms, visitors and transport can be planned together.

Checklist system

WorkInSync module

1. Seating and floor plans

Space Management: interactive floor plans, neighborhoods, team allocation

2. Move requests and approvals

Move Management: request, approval and bulk move flow

3. Service requests and tickets

Service Request Management: one place for all issues, SLA tracking, automatic escalation, category based configuration

4. Assets

Asset Management: transfer and tagging flow

6. Parking

Parking Booking: slot booking, waitlists, and team or department slot assignment

7. Cab routes

MoveInSync commute: scheduling, automated billing, AI-generated routing, live-tracking

9. Meeting and managed rooms

Room Booking with catering and IT request workflows; managed room requests 

11. Visitor hosts

Visitor Management with host approval on email and Teams

Office move checklist

Two colleagues planning an office relocation with a floor plan and a glass wall of blue sticky notes arranged in phases

12+ weeks before

  • Confirm move scope, date and an owner for each of the 12 systems

  • Publish the draft floor plan and seating assignments

  • Open a move request for every person and team moving

8 weeks before

  • Create service tickets for furniture, power, cabling, signage and cleaning

  • Record which assets move with each person and which stay

  • Raise IMACD requests for ports, Wi-Fi, printers, phones and device disposal

  • Re-run parking allocation for the new site

4 to 8 weeks before

  • Rebuild cab routes and shuttle stops, including night shifts

  • Tell employees about commute and parking changes

4 weeks before

  • Set up access permissions for the new floor

  • Configure meeting rooms and managed room requests

  • Set up mail redirection and update vendor addresses

Move week

  • Update visitor host details and brief reception

  • Update HRMS location, directory and emergency lists

  • Test access cards, routes and room bookings with real users

First 30 days

  • Remove old access permissions after the overlap

  • Close all move tickets and asset transfers

  • Reconcile the floor plan against actual occupancy

  • Review commute and parking complaints

[Download the checklist here]

FAQ

What is an office move checklist?
An office move checklist is a list of every task, system and owner involved in moving people and equipment, from planning to a post-move review. A complete one covers seating, assets, IT, access, parking, commute, visitors, mail and people data.

What should an office relocation plan include?
An office relocation plan should include the move scope and date, an owner for each system, a timeline working back from move day, an employee communication plan, a cutover plan and a 30-day post-move review.

What is the IMACD process?
IMACD stands for install, move, add, change and disposal. These are the five types of IT request that cover a device from setup to retirement. Facilities teams often use MAC (moves, adds, changes) for the same idea.

What is move management software?
Move management software handles move requests, approvals, scheduling and tracking, and updates the floor plan when a move is complete.

What is the difference between internal churn and an office relocation?
Internal churn is the ongoing movement of people within existing space. An office relocation is a one-off move to a new address, and it affects every system, including mail, commute and vendor records.

How early should you start planning an office move?
For a full relocation, start as soon as the date is known. Seating, move requests and long-lead items such as IT and parking typically need the most time.