An office move checklist is a list of every system, asset and service that has to change when people change location. A complete one covers 12 systems: seating, move requests, service tickets, assets, access cards, parking, cab routes, visitor host details, meeting rooms, mail, IT changes and people data.
Most checklists cover boxes, movers, furniture and floor plans. Fewer cover how people actually get to and into the new office: their cab pickup, their parking slot, their access card and the visitors who come to see them. Those are the items employees notice first, so they are the focus of this checklist.
Why office moves feel finished but aren’t
Move day is the part everyone plans. Many of the problems people notice show up in the first weeks afterward, in systems nobody put on the plan.
An employee sits at the right desk, but their access card still opens the old floor. Their cab pickup is still routed to the old building. Their parking slot is held by someone who moved months ago. Reception sends a visitor to a host who no longer sits there. A monitor that was supposed to move with them is still tagged to the old location.
Each of these is small. Together they decide whether people trust the move. The common cause is that the move was planned as a seating change, while people depend on a dozen connected systems, each with its own owner and its own records.
The 12-system office move checklist
For each system, name one owner, set a start date and add a check for the first 30 days after the move. The start times below are suggested starting points for a full relocation. Scale them to the size of your move.
| System | What breaks if you skip it | Usual owner | Start |
1 | Seating and floor plans | Wrong desk assignments, double allocation | Facilities, real estate | 12+ weeks before |
2 | Move requests and approvals | Untracked moves, conflicting requests, no audit trail | Workplace or space manager | 12+ weeks before |
3 | Service requests and tickets | Furniture, cabling, cleaning and setup tasks fall through | Facilities, IT | 8 weeks before |
4 | Assets (laptops, monitors, furniture, lockers) | Items lost, left behind or tagged to the wrong owner | IT, admin | 8 weeks before |
5 | IT installs, moves, adds, changes and disposal (IMACD) | Network ports, printers and phones not ready; old devices not retired | IT | 8 weeks before |
6 | Parking assignments | Slots held by people who moved, new arrivals with none | Admin, facilities | 8 weeks before |
7 | Cab routes and shuttle stops | Pickups and drops still point to the old site | Transport, admin | 4 to 8 weeks before |
8 | Access cards and door permissions | People locked out of the new floor, or still able to enter the old one | Security | 4 weeks before |
9 | Meeting rooms and managed rooms | Rooms unbookable, catering or AV not set up | Workplace team | 4 weeks before |
10 | Mail and courier forwarding | Deliveries to the old address, lost documents | Admin | 4 weeks before |
11 | Visitor host details | Guests sent to the wrong floor, hosts not notified | Reception, security | Move week |
12 | People data (HRMS, directory, emergency lists) | Wrong location on records, warden lists out of date | HR, facilities | Move week |
What to check in each system
1. Seating and floor plans: Check assignments against headcount per floor, then publish the new plan. If you use neighborhoods or team zones, move the zone, not just the people.
2. Move requests and approvals: Log every move as a request with a source, a destination and an approver. Moves agreed in chat or email are the ones most likely to be missing from the plan.
3. Service requests and tickets: Turn each physical task into a ticket with an owner and a due date: furniture, power, cabling, signage and cleaning. A move is done when its tickets are closed, not when people sit down.
4. Assets: Record what moves with each person and what stays. Update the location and custodian on every item.
5. IT installs, moves, adds, changes and disposal (IMACD): IMACD is the IT term for the five types of request that cover a device from setup to retirement. Facilities teams often say MAC (moves, adds, changes) for the same idea (TechTarget). Confirm that ports, Wi-Fi, printers and phones are live before people arrive. Plan how old devices will be retired.
6. Parking assignments: Re-run allocation for the new site and release slots held by people who no longer use them. Parking is easy to leave off a move plan because it often sits with a different team. For allocation models, see our guide to parking lot management.
7. Cab routes and shuttle stops: If employees use company-arranged cabs or shuttles, their pickup points, route timings and eligibility all depend on the office address. Rebuild the routes before move day and tell employees which pickup applies from which date. Plan late-shift and night-shift travel separately.
8. Access cards and door permissions: Add permissions for the new floor before move day. Remove the old ones after a short overlap. Test with real cards, not just the admin console.
9. Meeting rooms and managed rooms: Rooms that need catering, AV or setup are different from open rooms. Decide which rooms will be managed at the new site and how people will request them.
10. Mail and courier forwarding: Set up redirection with your postal service and update vendor and courier address records. In India, India Post handles mail redirection through the post office serving the old address (Post Office Guide). In Australia, business mail can be redirected for 1, 3, 6 or 12 months (Service NSW). Assign one person to collect misdirected mail for the first month.
11. Visitor host details: Hosts need the right floor, desk or room on file, and reception needs the new floor plan. Check pre-registered guests for the first week by hand.
12. People data: Update the location field in your HRMS and directory. Refresh the fire warden and first aid lists for the new floor.
Commute and parking: the part most plans miss
A new address changes how every person gets to work. Commutes can get longer or shorter, a shuttle stop can disappear and the car park can be oversubscribed on the first Monday.
Before you fix a move date, answer five questions:
Which employees will see a materially different commute, and have they been told?
Have cab routes and pickup times been rebuilt for the new site?
Does the new car park have enough slots for the people who drive, and who gets them?
How will late-shift and night-shift travel work from the new location?
Who will handle commute complaints in the first two weeks?
What to include in an office relocation plan
An office relocation plan is the project version of this checklist. For a full relocation, JLL suggests starting preparation up to 24 weeks in advance (JLL). A practical plan includes:
Scope and date: which teams, floors and sites are moving, and when
Owners: one named owner for each of the 12 systems
Timeline: start dates working back from move day, as in the table above
Communication plan: what employees hear, when, and from whom, including commute changes
Cutover plan: what switches on move day, such as access, routes and the floor plan, and what to do if something fails
Post-move review: a 30-day check on every system, with open issues tracked as tickets
Internal churn vs. full relocation
The 12 systems apply to both, but the effort differs.
| Internal churn (within a building or campus) | Full relocation (new address) |
Frequency | Continuous, often weekly | One-off project |
Biggest risks | Untracked small moves, stale floor plans, unreturned assets | Mail, commute, parking, access and vendor addresses all changing at once |
Best approach | A standing request and approval process | A dated project plan with a cutover rehearsal |
Systems most affected | 1, 2, 3, 4, 8, 9 | All 12 |
Teams with high churn benefit most from a move process that never closes. For them, the cost isn’t one big move. It’s hundreds of small moves, each of which can leave a record out of date.
Keeping the floor plan accurate after the move
A floor plan is accurate on the day you publish it and starts drifting soon after. Three habits keep it accurate:
Treat every change as a move request, even a single desk swap.
Reconcile monthly against badge data, bookings or a walk of the floor.
Close the loop with tickets. A move is complete only when its tickets and asset transfers are closed.
For organizations with several sites, one shared source of truth matters even more. See our guide to a workplace management system for multi-location offices and our definitive guide to space planning.
What to look for in move management software
Move management software handles move requests, approvals, scheduling and tracking, and updates the floor plan when a move is complete. When you compare options, check whether it:
connects move requests to the live floor plan, so seating updates automatically
creates service tickets for the physical work behind each move
transfers assets to their new location and owner
updates parking, room and visitor records along with seating
connects to commute planning if you run employee transport
reports on churn and on moves still open
How WorkInSync covers the 12 systems
WorkInSync is the workplace management suite from MoveInSync, which also runs employee commute. That means seating, parking, rooms, visitors and transport can be planned together.
Checklist system | WorkInSync module |
1. Seating and floor plans | Space Management: interactive floor plans, neighborhoods, team allocation |
2. Move requests and approvals | Move Management: request, approval and bulk move flow |
3. Service requests and tickets | Service Request Management: one place for all issues, SLA tracking, automatic escalation, category based configuration |
4. Assets | Asset Management: transfer and tagging flow |
6. Parking | Parking Booking: slot booking, waitlists, and team or department slot assignment |
7. Cab routes | MoveInSync commute: scheduling, automated billing, AI-generated routing, live-tracking |
9. Meeting and managed rooms | Room Booking with catering and IT request workflows; managed room requests |
11. Visitor hosts | Visitor Management with host approval on email and Teams |
Office move checklist
12+ weeks before
Confirm move scope, date and an owner for each of the 12 systems
Publish the draft floor plan and seating assignments
Open a move request for every person and team moving
8 weeks before
Create service tickets for furniture, power, cabling, signage and cleaning
Record which assets move with each person and which stay
Raise IMACD requests for ports, Wi-Fi, printers, phones and device disposal
Re-run parking allocation for the new site
4 to 8 weeks before
Rebuild cab routes and shuttle stops, including night shifts
Tell employees about commute and parking changes
4 weeks before
Set up access permissions for the new floor
Configure meeting rooms and managed room requests
Set up mail redirection and update vendor addresses
Move week
Update visitor host details and brief reception
Update HRMS location, directory and emergency lists
Test access cards, routes and room bookings with real users
First 30 days
Remove old access permissions after the overlap
Close all move tickets and asset transfers
Reconcile the floor plan against actual occupancy
Review commute and parking complaints
[Download the checklist here]
FAQ
What is an office move checklist?
An office move checklist is a list of every task, system and owner involved in moving people and equipment, from planning to a post-move review. A complete one covers seating, assets, IT, access, parking, commute, visitors, mail and people data.
What should an office relocation plan include?
An office relocation plan should include the move scope and date, an owner for each system, a timeline working back from move day, an employee communication plan, a cutover plan and a 30-day post-move review.
What is the IMACD process?
IMACD stands for install, move, add, change and disposal. These are the five types of IT request that cover a device from setup to retirement. Facilities teams often use MAC (moves, adds, changes) for the same idea.
What is move management software?
Move management software handles move requests, approvals, scheduling and tracking, and updates the floor plan when a move is complete.
What is the difference between internal churn and an office relocation?
Internal churn is the ongoing movement of people within existing space. An office relocation is a one-off move to a new address, and it affects every system, including mail, commute and vendor records.
How early should you start planning an office move?
For a full relocation, start as soon as the date is known. Seating, move requests and long-lead items such as IT and parking typically need the most time.